Hey guys in the middle of a new home build. In the midst of installing wood flooring on 2nd floor. Getting close to the stairs and decided to jump ahead.
Here is what I am dealing with..
I am installing my landing tread as such (used a scrap so you can get an idea)
My concern is tying this 5/4 stair stringer into my eventual 1x base molding.. Is there any pointers to transition this 5/4 into my 1x molding? Really not liking the thought of 5/4 trim..
Kind of stumped so figured I'd see if any finish professionals had some ideas or pics to share! Thanks in advance.
Here is what I am dealing with..

I am installing my landing tread as such (used a scrap so you can get an idea)

My concern is tying this 5/4 stair stringer into my eventual 1x base molding.. Is there any pointers to transition this 5/4 into my 1x molding? Really not liking the thought of 5/4 trim..
Kind of stumped so figured I'd see if any finish professionals had some ideas or pics to share! Thanks in advance.