It would dry quicker but routing it out would make it more likely to crack than it would otherwise.I have a 3 ft cross section of oak that I am planning on planing with my plunge router. Do i have to wait for it to dry out? If I cut it down to within an inch of my desired depth it would dry out quicker yes?