You can glue them together.then clamp overnight .That's normal routine. You said Gorilla glue, are you talking about gorilla wood glue or the stuff that expands?blue sky said:
You can glue them together.then clamp overnight .That's normal routine. You said Gorilla glue, are you talking about gorilla wood glue or the stuff that expands?blue sky said:I'm building a bench top made with Douglas Fir S4S 4x4s and want to make sure my plans/techniques checks out before I start. The dimensions are 28" x 58". I'm planning to simply glue them together with Gorilla Glue, then clamp together overnight to dry. Is this all there is to it to make a strong bond and quality top or should I be thinking about doing it another way?
Thanks.
Going to use Gorilla wood glue. Do you recommend anything better? Also, what about the wood prep? Can I just butt them up against each other, glue, and clamp as is since they're S4S, or should I prep them in any way?You can glue them together.then clamp overnight .That's normal routine. You said Gorilla glue, are you talking about gorilla wood glue or the stuff that expands?
Thanks for the allthread tip, I like that better than using clamps.Blue,
I don't know if I would use the gorilla glue, up to you on that. I like titebond II & III. You might want to consider cutting a groove in each of the sides to be glued up and make a spline to fit. It would help you to align the pieces while you are gluing and keep them straight. It will also strengthen your joints. It could easily be done on a table saw.
The other thing you could do is predrill the 4xs and insert about 3 lengths of 1/2" allthread after you glue it and tighten them up for your clamps and just leave them in place. Counter bore the end so the rods don't stick out. Just a couple of ideas for you.
Mike Hawkins![]()
Gorilla wood glue works good for me. It has a good initial tack, and drys clear. You might want to double check to make sure that the glue joint is square 90 deg before glue up. Yes clamps will be fine, no need for spline.blue sky said:Going to use Gorilla wood glue. Do you recommend anything better? Also, what about the wood prep? Can I just butt them up against each other, glue, and clamp as is since they're S4S, or should I prep them in any way?
Thanks for the tip about using 2x4s instead. I haven't picked up the lumber yet and will give it some thought before I do. If I stick with the 4x4s, I can rip them to make sure they're square. One reason for the 4x4s is cost (only $14.81 for a 20' length at my local HD, so I can build this bench top for less than $30 in lumber). 2x4s would cost more.Reason is almost every 4 x 4 I've ever seen has already or will check. I'd use 2x 4's instead an look for the straightest and flatest of the pile. You are only gonna do this once, and you want to minimize the checking.
If the 28" width is critical then of course you could not use 24" plywood ripped from 48" sheets.Some ply comes in 60 x 60 so that would work better. You will probably cover it with something anyway, plywood or hardboard. http://www.kencraftstore.com/ply3.htm
Every one of my benches is made from a solid core door in 30" wide and 6'8" long covered with 1/4" hardboard except one, which is laminated maple 2 1/2" x 1 1/2" x random lengths. It's a beautiful top and more of a showpiece than a work surface at least so far.bill
If I stick with the 4x4s, I can rip them to make sure they're square.
His 5HP Powermatic 12"er.What will you be using to rip these? :smile:
Go and sight down one of those 20 footers and then see how much you want them. !0 ft 2xs arent that expensive and will bend to clamp pressure easier than a 4 x 4 if they are a little warped. And you will not want to rip the 4 x 4s they will curve like crazy after they're cut and to top it all off a 10" saw blade will cut up at most 3 1/4" and the 4 x 4 measures 3 1/2". All this is free advice of course is based on experience.Thanks for the tip about using 2x4s instead. I haven't picked up the lumber yet and will give it some thought before I do. If I stick with the 4x4s, I can rip them to make sure they're square. One reason for the 4x4s is cost (only $14.81 for a 20' length at my local HD, so I can build this bench top for less than $30 in lumber). 2x4s would cost more.
Okay, based on what everyone is saying, I'm a little nuts for wanting to build this with 4x4s. I get the concept of 2x4s being more flexible and a better option, even though it'll cost more. From the start, I thought it would be easier with less parts, but it doesn't sound like I had thought it through. I'll change my plans for 2x4s and I'll still use three allthreads to clamp them together, instead of dowels.Go and sight down one of those 20 footers and then see how much you want them. !0 ft 2xs arent that expensive and will bend to clamp pressure easier than a 4 x 4 if they are a little warped. And you will not want to rip the 4 x 4s they will curve like crazy after they're cut and to top it all off a 10" saw blade will cut up at most 3 1/4" and the 4 x 4 measures 3 1/2". All this is free advice of course is based on experience.bill
Thanks for the tips. And yes, I want a bench that will last longer than me. I'll build the frame tomorrow and the top probably next weekend. Here's a link to the page where I got the plans for the frame. It looks very sturdy, looks good, and the material will be less than $65.Don't forget that you will have to rip each 2x4 to remove the rolled edge. This will provide a flat bench top surface. Usually a 1/8" to 3/16" cut will remove even the most rolled edge of lumber from Lowes or HD. It will also give you an opportunity to cut away slight warps and bows if you use a very long fence on the table saw.
It sounds like you and I both like a solid work bench. I have three of this type of bench out in the barn with 4x4 oak legs. And yes, you could work on a big block engine on any one of them.
It sounds like you're on the right track to building a great bench. Good luck.
I'd like the "buther block" look when done. My question is without planning the 2x4 faces, would I get the look I want OR will it be sloppy looking.Go and sight down one of those 20 footers and then see how much you want them. !0 ft 2xs arent that expensive and will bend to clamp pressure easier than a 4 x 4 if they are a little warped. And you will not want to rip the 4 x 4s they will curve like crazy after they're cut and to top it all off a 10" saw blade will cut up at most 3 1/4" and the 4 x 4 measures 3 1/2". All this is free advice of course is based on experience.bill
Construction 2 Xs come milled with a rounded edge which you would want to remove before face gluing them other wise you'll have little valleys for crud to fall into. Ideally they should be ripped off on the table saw...kinda a pain, but no other choice.I'd like the "buther block" look when done. My question is without planning the 2x4 faces, would I get the look I want OR will it be sloppy looking.