Joined
·
24,011 Posts
What contact cement did you use...waterbase or solvent base?
What was the ambient temperature?
.
What was the ambient temperature?


.
Temperature should be above 65 degrees. The back of the laminate only needs one good application...it's not that porous. The MDF should take two. Allow the first to dry, and apply the second. The surfaces have about an hour of open time, and can feel slightly tacky to dry before laminating.Ambient temperature was 62-64 degrees....dap contact cement which by the smell alone I'd guess was solvent based. The odd part to me is that most of it adhered fine....