Joined
·
466 Posts
So this past weekend I got back in the shop for the first time since last December when I was hit with some medical problems. I have spent some time working on getting things back together after some recent remodel work that took place that displaced my basement shop for some time. I started working on my next project that has been on the books for some time. I am building some shelving for all of the toys that come with kids that take up so much room. When I had my drain tile installed I had to rip up about two feet of the laminate floor that was in my basement so the shelving will cover the missing floor as well as create a great place for all of those toys.