Woodworking Talk banner

Advice needed for mounting a heavy weightlifting rack to a wall

1.5K views 9 replies 6 participants last post by  banjopicks  
I'm no engineer, but I'm with you in thinking that going into the dowels should be fine (assuming the glue cures which I would rely on temps on the label for). However, it looks like the lags you're using to go into the wood stringer are pretty short. Unless that's what came with the Kit, I would go with @Tree Hugger 's suggestion on the stringer (go through and use washers/nuts).

EDIT: It's also worth noting that the lags going through the wood stringer into the studs are effectively doing double duty. Again, I'm no engineer so that might be fine but probably worth throwing in a couple extra lags per stud in that empty space of the metal stringer.