Pricing work? Pricing work?
Register Woodworking Photos FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Display Modes
Old 11-13-2006, 08:53 PM   #1
Big Dave
Senior Member
 
Big Dave's Avatar
 
Join Date: Sep 2006
Location: Southwest Mo.
Posts: 1,036
View Big Dave's Photo Album My Photos

Old Gallery
Send a message via Yahoo to Big Dave
Default Pricing work?

Since this topic was brought up I thought I would start a new thread and get everyones input.

When pricing small projects, you know stuff that takes less than a day, how do you price it?

I just ran into this on Saturday. I went to look at a small log handrail job and it's only 14 running feet. I usually only charge $15.00 a running foot for labor only. Which means that I should charge only $210.00. The problem is the job is 85 miles one way. Just for kicks on this job I bid it at $500.00 one day flat charge plus material. I usually like to make that, need to make that, for a full days work. I give them the price and they called today and want me to do it. So this time it worked and I think I will do it from now on.

Anyway I'm just carrying on. So what's your view?
__________________
Do one thing at a time, do it well, then move on.
www.bigdaveswoodworks.com
Big Dave is offline   Reply With Quote
Join Contractor Talk

Join the #1 Woodworking Forum Today - It's Totally Free!

Do you love woodworking? Are you looking to connect with other woodworkers? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for woodworkers to meet online. No matter what your skill level you'll find that WoodworkingTalk.com is a great community to join. Best of all it's totally free!

Join WoodworkingTalk.com - Click Here JOIN FOR FREE

Also view our DIY Forum here

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. WoodworkingTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any woodworking or home improvement task!
Old 11-13-2006, 10:06 PM   #2
Norrud
Junior Member
 
Join Date: Oct 2006
Location: Crossville, Tennessee
Posts: 17
View Norrud's Photo Album My Photos

Old Gallery
Default

Here in Tennessee I would have taken the $210 for a days work and tacked on .40 per mile round trip to the job since it wasn't local. But hey $500 a day sounds good to me. I want to come work for you.
__________________
Ron
"why is there never enough time to do it right the first time but always enough time to do it over again"
Norrud is offline   Reply With Quote
Old 11-13-2006, 10:27 PM   #3
Rob
Senior Member
 
Rob's Avatar
 
Join Date: Oct 2006
Location: Delaware
Posts: 547
View Rob's Photo Album My Photos

Old Gallery
Default

I charge $35 per hour. That includes me driving 1.5 hours round trip to get decent lumber, he time it takes to mill it...pretty much everything. I charge the customer for the ride(s) to their house and I pay for the trip back.
Sometimes if I don't want a particular job (I do a lot of handyman type stuff also), I will price it so high, I think no one in their right mind would hire me. 9 out of 10 times I get ..."When can you start".
I never...repeat..never price any work from how well off I think someone is. If they live in a shack or a mansion, a bookcase is a bookcase and it will cost you this much.
Rob is offline   Reply With Quote
Old 11-13-2006, 10:59 PM   #4
nywoodwizard
Senior Member
 
nywoodwizard's Avatar
 
Join Date: Oct 2006
Location: Lindenhurst,NY
Posts: 119
View nywoodwizard's Photo Album My Photos

Old Gallery
Default

I run in to that all the time and i simply came up with a min charge to do small jobs were calculating the prices adds up to a sandwich and a cup of coffee,(i eat big sandwiches)material aside,only you can say what you need as a min to make for the day or half a day. I charge a little more extra for travel also,Its called "fuel surcharge"
__________________
"You must become one with the wood grass hopper"
nywoodwizard is offline   Reply With Quote
Old 12-09-2006, 09:22 PM   #5
formula462
Senior Member
 
formula462's Avatar
 
Join Date: Dec 2006
Location: Arlington,Texas
Posts: 219
View formula462's Photo Album My Photos

Old Gallery
Default

I have a hard time with the small projects as well. Just recently a homeowner asked if I could install twin doors on an existing cased opening and I gave her a price of 750.00(no finish work)and she agreed. I had the door co. that did the other doors make the odd size twins with a astragal,hinged and bored for the lockset.Once I got the doors all I had to do was mortise the hinges to the jamb,tweak them to line up and install door stop. This took two of my guys 2hrs and when I got to the job I invoiced her 600.00 and she looked at me like I was ripping her off(150.00 less than I said) . Have any of you run into that problem,quoting a price and when it gets done quicker than they think it should have expect a lesser bill? Anyway I got the invoice from the door co. and it was a lot less than I anticipated so I called her up and said to take another 100.00 off the bill and I still haven't recieved a check. The doors were 160.00, the guys time was 75.00 and I bought the door handle(26.00). So my profit was 240.00,what's wrong with that,so I'm a capitalist and when I get the check I'm buying a dovetail jig...
formula462 is offline   Reply With Quote
Old 12-09-2006, 09:25 PM   #6
Big Dave
Senior Member
 
Big Dave's Avatar
 
Join Date: Sep 2006
Location: Southwest Mo.
Posts: 1,036
View Big Dave's Photo Album My Photos

Old Gallery
Send a message via Yahoo to Big Dave
Default

I don't see anything wrong with that at all. I've had some people comment on how fast I did something but they realize that I've got a lot of time invested in getting materials together and going and looking at the job. If I see that a customer thinks I'm making a killing then I start to go into how much time I have invested and the amount of miles that I have put on to bid the job and then to do the job.

I'm sure if you bid it too cheap you wouldn't get any sympathy from her either.
__________________
Do one thing at a time, do it well, then move on.
www.bigdaveswoodworks.com
Big Dave is offline   Reply With Quote
Old 12-09-2006, 10:36 PM   #7
nywoodwizard
Senior Member
 
nywoodwizard's Avatar
 
Join Date: Oct 2006
Location: Lindenhurst,NY
Posts: 119
View nywoodwizard's Photo Album My Photos

Old Gallery
Default

yea but when she agreed ,did you have her sign a contract ?I have my customers recite the contract,then agree to the terms,ask if they have any questions,then sign.then there is no excuse not to pay,or "forget" what the estimate was,I get aleast half up front most of the time ,sometimes more,and i never take checks,i make sure my ass is covered,if a customer tries to screw me at least i don't end up buying his materials out of my pocket
__________________
"You must become one with the wood grass hopper"
nywoodwizard is offline   Reply With Quote
Old 12-09-2006, 11:54 PM   #8
formula462
Senior Member
 
formula462's Avatar
 
Join Date: Dec 2006
Location: Arlington,Texas
Posts: 219
View formula462's Photo Album My Photos

Old Gallery
Default

Not to worried about it,I still have a master key to the house....
formula462 is offline   Reply With Quote
Old 12-13-2006, 04:36 PM   #9
bob4814
Member
 
bob4814's Avatar
 
Join Date: Dec 2006
Location: Michigan
Posts: 40
View bob4814's Photo Album My Photos

Old Gallery
Default Time and materials

On small jobs I will quote the project and I always get at least half down. I didn't in the beginning and I got burned on some really small deals. So not I insist on a deposit. I also get paid when the customer pics up the project. Nothing leaves the shop until it's paid for. If asked I tell them my account insists on it. That usually is enough said. I've taken a lot of checks over the last three years and I've been lucky so far.

As to pricing an item I originally took the material cost and doubled it. That works for small easy to do pieces. On the more complex jobs I keep track of all the hours and figure in $25 an hour.

Where it gets difficult is when I'm building something that I havn't done before. Case in point: my current project, a 15 drawer jewelry box table. Each drawer is 17 inches long x 3 wide with 5 compartments in each drawer. The drawers are felt lined. The configuration is 3 drawers wide x 5 high. The frame is knotty pine and the legs are cedar log. This project has a lot of hurry up and wait glueing time. I'm speeding up the glue time by using Super Gel. I buy it in 50 gram bottles x 20 bottles to the case. It cuts the dry time to about 10 minutes, but it's not dead time because I've got several other projects I'm working on. So anyway, keeping track of time on this one job is a bit of a pain. So far I'm 2 1/2 days into it and I've got about 10 hours billed to it. Sometimes the best guess principle comes into play.
__________________
http://www.woodworksofcs.com "Develop who you are, not who you aren't."
"Back of every creation, supporting it like an arch, is faith. Enthusiasm is nothing: it comes and goes. But if one believes, then miracles occur."
bob4814 is offline   Reply With Quote
Old 12-24-2006, 01:55 AM   #10
oscorner
Junior Member
 
Join Date: Dec 2006
Posts: 22
View oscorner's Photo Album My Photos

Old Gallery
Default

I ran into this problem once or twice in my dirt business. People tend to get upset when you drop the original bid once the job is done because they look at it as though you were trying to rip them off with your orignal quote, instead of being pleased that you passed on the savings to them. It's weird, but that's human nature for you. I personally would be tickled to death if I got a lower price than the one quoted me. In these cases, sometimes your reputation would fair better if you stick with your original bid and if they give you more work in the future give them the break then. This way they don't tell others that you over bid or don't seem to know what you are doing because your bid was so far off. At least, that has been my experience.
oscorner is offline   Reply With Quote
Old 12-24-2006, 02:32 AM   #11
formula462
Senior Member
 
formula462's Avatar
 
Join Date: Dec 2006
Location: Arlington,Texas
Posts: 219
View formula462's Photo Album My Photos

Old Gallery
Default

You take the money if it's overbid and don't feel bad,why,because if you underbid does the person ever say, "Okay,here's more money", no it's always,"Well,that's what you said it would cost so tuff luck".
By making more on jobs where you should not have equals out the ones where you had to take it. I deal with this on a weekly basis and right now I'm behind in the "process" but have a job coming up that will more than make it up. Semantics,it's all in how you look at it.
formula462 is offline   Reply With Quote
Reply

« Previous Thread | Next Thread »
Thread Tools
Show Printable Version Show Printable Version
Email this Page Email this Page
Display Modes
Linear Mode Linear Mode
Hybrid Mode Switch to Hybrid Mode
Threaded Mode Switch to Threaded Mode

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off

Similar Threads
Thread Thread Starter Forum Replies Last Post
pricing help, anyone?? gabestorace General Woodworking Discussion 2 05-16-2008 08:14 AM
Pricing Work Penny General Woodworking Discussion 3 03-29-2008 09:22 AM
Job Pricing ? hubaseball General Woodworking Discussion 13 01-17-2008 05:24 AM
Pricing cabinets canoebuilder General Woodworking Discussion 5 07-19-2007 09:12 PM
Pricing work jodiemeglio General Woodworking Discussion 7 06-06-2007 05:08 PM

Top of Page | View New Posts

All times are GMT -4. The time now is 03:08 PM.

Contact Us - Woodworking Forum - Top

Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.2.0
Woodworking Talk © 2005 - 2009 The Building Network LLC
Our Network: Contractor Forum | DIY Forum | Painting Forum | Electrician Forum | Drywall Forum