Reload this Page Bid these Built-Ins
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Display Modes
Old 12-09-2006, 01:48 PM   #1
C&D Woodcraft
Member
 
C&D Woodcraft's Avatar
 
Join Date: Nov 2006
Location: Delaware
Posts: 86
View C&D Woodcraft's Photo Album My Photos
Default Bid these Built-Ins

I just finished these built-ins yesterday. I botched the estimate--BIG TIME (labor). I'm curious on what your labor estimate (hrs) would have been on this job. The dimensions are 11 1/2' x 8'. The top shelves are 15" deep, the bottom are 18". There are a total of 27 shelves, all have been edged with 1x hardwood. The cases and the doors are MDF, the frames are poplar. Painting was the part that I really took a bath--prime and 2 finish coats.
How would you have bid this one?

Thanks.

--Darrell
Attached Images
 

C&D Woodcraft is offline   Reply With Quote
Join Contractor Talk

Join the #1 Woodworking Forum Today - It's Totally Free!

Do you love woodworking? Are you looking to connect with other woodworkers? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for woodworkers to meet online. No matter what your skill level you'll find that WoodworkingTalk.com is a great community to join. Best of all it's totally free!

Join WoodworkingTalk.com - Click Here JOIN FOR FREE

Also view our DIY Forum here

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. WoodworkingTalk.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any woodworking or home improvement task!
Old 12-09-2006, 05:12 PM   #2
desert door and trim
Junior Member
 
Join Date: Nov 2006
Posts: 20
View desert door and trim's Photo Album My Photos
Default

If I built them at my shop and then assembled them on site, I would bid three days. If I built them on site, I would bid 7 days. obviously I wouldnt built them on site. Around $600 for materials. $50 per hour and then a couple hundred to cover my butt. I wouldnt paint it though, and it sounds like that is what your mistake was. but my unpainted bid would be $2200.

looks good.

desert door and trim is offline   Reply With Quote
Old 12-09-2006, 11:18 PM   #3
formula462
Senior Member
 
formula462's Avatar
 
Join Date: Dec 2006
Location: Arlington,Texas
Posts: 219
View formula462's Photo Album My Photos
Default

Did you do the rest of the trim around it and were they built/painted offsite or did you have to mask everything? Looks like a great job as though they were done prior to the room being painted.
formula462 is offline   Reply With Quote
Old 12-09-2006, 11:54 PM   #4
Rob
Senior Member
 
Rob's Avatar
 
Join Date: Oct 2006
Location: Delaware
Posts: 714
View Rob's Photo Album My Photos
Default

I probably would have come somewhere in the neighborhood of $4000-$4500 for what I see in the picture. Finishing takes a long time (for me anyway) I just sprayed 22 BB cabinet doors today with shellac and it took me a total of 5 hours with prep and clean-up.
Great looking job!
I still give "estimates" even for work like this. If the price has to go up a little...you are covered to a degree.
Rob is offline   Reply With Quote
Old 12-10-2006, 01:54 PM   #5
C&D Woodcraft
Member
 
C&D Woodcraft's Avatar
 
Join Date: Nov 2006
Location: Delaware
Posts: 86
View C&D Woodcraft's Photo Album My Photos
Default

Thanks for the input y'all. Definitely a learning experience for me. I built everything in the shop and painted prior to being on site. I made the bottom cabinets in two sections (a set of 3 and 2). The top was 5 individual units; each one had one stile attached so it would cover the edge of the next cabinet. Once I got to the site I just had to add the end stiles, the rails and of course the base/crown molding. The only painting was touching up the nail and screw holes.
Actual time spent broke down as 2.5 days in the shop, 1 day to install and 2.5 days of painting. I had originally estimated 20 hours--. Must have had too much spiked eggnog that night!

This client also wants me build a bar, china cabinet and entertainment center in the future. Fortunately I haven't bid them yet. I'll have to explain why the next estimates are noticeably higher (because my family needs to eat!)


Quote:
Originally Posted by formula462 View Post
Did you do the rest of the trim around it and were they built/painted offsite or did you have to mask everything? Looks like a great job as though they were done prior to the room being painted.
I also installed the crown, beadboard, caprail and baseboard in the same room. The homeowner is going to paint the door casings to match the white trim.
C&D Woodcraft is offline   Reply With Quote
Old 02-01-2012, 02:40 AM   #6
Pcs
Member
 
Pcs's Avatar
 
Join Date: Jan 2012
Posts: 44
View Pcs's Photo Album My Photos
Default

What did you do the job for? I wouldn't have touched it for less than 6000
Pcs is offline   Reply With Quote
Old 02-02-2012, 09:58 AM   #7
mackem
Senior Member
 
mackem's Avatar
 
Join Date: May 2007
Location: U.K.
Posts: 446
View mackem's Photo Album My Photos
Default

Quote:
Originally Posted by Pcs View Post
What did you do the job for? I wouldn't have touched it for less than 6000

Is that at the year 2006 prices?
__________________
Kevin.

“There are no secrets in woodworking, and everything should be shared.” Sam Maloof
mackem is offline   Reply With Quote
Old 02-02-2012, 10:48 AM   #8
Pcs
Member
 
Pcs's Avatar
 
Join Date: Jan 2012
Posts: 44
View Pcs's Photo Album My Photos
Default

No now days
Pcs is offline   Reply With Quote
Old 02-03-2012, 08:06 PM   #9
Rebelwork
Member
 
Join Date: Jan 2012
Location: Odessa,MO
Posts: 66
View Rebelwork's Photo Album My Photos
Default

Quote:
Originally Posted by mackem View Post
Is that at the year 2006 prices?
Please explain....
Rebelwork is offline   Reply With Quote
Old 02-05-2012, 08:50 AM   #10
Double
Member
 
Join Date: Feb 2010
Location: Dallas, TX
Posts: 41
View Double's Photo Album My Photos
Default

2006...Pre-Crash
Double is offline   Reply With Quote
Old 02-05-2012, 09:42 AM   #11
Steve Neul
Senior Member
 
Join Date: Sep 2011
Posts: 4,002
View Steve Neul's Photo Album My Photos
Default

I charge $350.00 a linial foot for a finished piece like that plus extra for pull out shelves or other special drawers or devices. I build units like that in my shop and would charge an additional $340.00 for a the installation.
Steve Neul is online now   Reply With Quote
Old 02-05-2012, 11:14 AM   #12
cabinetman
Old School
 
cabinetman's Avatar
 
Join Date: Jul 2007
Location: So. Florida
Posts: 17,865
View cabinetman's Photo Album My Photos
Default

Quote:
Originally Posted by Pcs View Post
What did you do the job for?
+1.






.
__________________
Photos - 4 Pages: http://www.woodworkingtalk.com/galle...00&ppuser=1269
cabinetman is online now   Reply With Quote
Old 02-14-2012, 01:32 AM   #13
carpentry masters
carpenter
 
carpentry masters's Avatar
 
Join Date: Jan 2012
Location: Millstone Twp, New Jersey
Posts: 4
View carpentry masters's Photo Album My Photos
Default

I would charge somewhere between 3000 - 3500 finished. You did excellent work but unless you want that to look like a library I would brake that countless shelve lines with some wood / glass doors in the middle of some thicker column-like moldings to highlight center section etc., you probably know what I'm talking about :)

Very nice.
__________________
CarpentryMasters.co - Decorative Home Trim Specialist
carpentry masters is offline   Reply With Quote
Old 02-14-2012, 07:03 AM   #14
Taylormade
Senior Member
 
Taylormade's Avatar
 
Join Date: Feb 2011
Location: Tampa, FL
Posts: 1,517
View Taylormade's Photo Album My Photos
Default

Quote:
Originally Posted by mackem View Post
Is that at the year 2006 prices?
Quote:
Originally Posted by Rebelwork View Post
Please explain....
Quote:
Originally Posted by Double View Post
2006...Pre-Crash
Look at the post prior to Mackem's. This thread was resurrected from 2006.
__________________
Ut Prosim
Taylormade is offline   Reply With Quote
The Following User Says Thank You to Taylormade For This Useful Post:
mackem (02-17-2012)
Old 02-14-2012, 07:46 AM   #15
Corbin3388
Senior Member
 
Corbin3388's Avatar
 
Join Date: Jan 2011
Location: Palmdale Ca
Posts: 526
View Corbin3388's Photo Album My Photos
Default

3-4k all day in my neck of the woods

Sent from my iPhone using Wood Forum
Corbin3388 is offline   Reply With Quote
Old 02-24-2012, 10:31 PM   #16
Nickpod28
Junior Member
 
Join Date: Oct 2011
Posts: 9
View Nickpod28's Photo Album My Photos
Default

I wouldnt go any less than 4k. Is it common for you guys to have issues with finding customers willing to pay for you to make a decent profit? thanks.
Nickpod28 is offline   Reply With Quote
Old 02-24-2012, 10:57 PM   #17
Corbin3388
Senior Member
 
Corbin3388's Avatar
 
Join Date: Jan 2011
Location: Palmdale Ca
Posts: 526
View Corbin3388's Photo Album My Photos
Default

Quote:
Originally Posted by Nickpod28
I wouldnt go any less than 4k. Is it common for you guys to have issues with finding customers willing to pay for you to make a decent profit? thanks.
Depends who your clientele is.

Sent from my iPhone using Wood Forum
Corbin3388 is offline   Reply With Quote
Old 03-06-2012, 09:44 PM   #18
Michael Ryan
Junior Member
 
Join Date: Dec 2011
Posts: 5
View Michael Ryan's Photo Album My Photos
Default

$800 a LF
Michael Ryan is offline   Reply With Quote
Old 03-15-2012, 05:29 PM   #19
TylerJones
Senior Member
 
Join Date: Dec 2011
Location: East Texas
Posts: 159
View TylerJones's Photo Album My Photos
Default

Dang I thought I was high at 400+ a LF. Though I would have hired out paint.

TylerJones is offline   Reply With Quote
Reply

« Previous Thread | Next Thread »
Thread Tools
Show Printable Version Show Printable Version
Email this Page Email this Page
Display Modes
Linear Mode Linear Mode
Hybrid Mode Switch to Hybrid Mode
Threaded Mode Switch to Threaded Mode

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off

Forum Rules

Similar Threads
Thread Thread Starter Forum Replies Last Post
Built in Desk mdlbldrmatt135 Trim Carpentry & Built-Ins 15 12-02-2008 11:36 PM
Built-in Hutch BlockHead Project Showcase 7 03-03-2008 07:11 PM
A real built-in nywoodwizard Trim Carpentry & Built-Ins 11 02-19-2008 05:32 PM
Built ins Youngman Trim Carpentry & Built-Ins 0 12-28-2007 03:52 PM
Red Oak Built In cabinetman Project Showcase 6 08-07-2007 11:44 AM

Top of Page | View New Posts

All times are GMT -4. The time now is 08:17 AM.

Contact Us - Affiliate Disclosure - Privacy Policy - Woodworking Forum - Top

Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2013, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.6.0 RC 2
Woodworking Talk © 2005 - 2010 The Building Network LLC
Our Network: Contractor Forum | DIY Forum | Painting Forum | Electrician Forum | Drywall Forum