Been working on this job for a while now (to long) and it is finally coming to the point of install. I was suppose to start the install tomorrow but put a call into the HO to find out where the painters were at and it seems that they aren't ready. So I will be installing on Wednesday.
Most of the stuff was delivered to the house on Friday. But the built ins were still being finished. So today I looked at a kitchen and took some measurements and got the downpayment. I got one of the built in cabinets ready for delivery. Had to put the backs on, the drawers in and the drawer fronts on. Here is the result:
Paint color is Ben Moore White Dove, done in MLC Resistant and top coated with Krystal. The drawer slides are Accuride full extension w/a 150 lb rating. The Pendeflex folder rails were made by me using 1/2" "L" aluminum that I cut to size and rounded the edges and drilled mounting holes.
The Molding will get a cap that isn't shown in the picture, it was wrapped up and I didn't want to unwrap it before delivery.
Most of the stuff was delivered to the house on Friday. But the built ins were still being finished. So today I looked at a kitchen and took some measurements and got the downpayment. I got one of the built in cabinets ready for delivery. Had to put the backs on, the drawers in and the drawer fronts on. Here is the result:
Paint color is Ben Moore White Dove, done in MLC Resistant and top coated with Krystal. The drawer slides are Accuride full extension w/a 150 lb rating. The Pendeflex folder rails were made by me using 1/2" "L" aluminum that I cut to size and rounded the edges and drilled mounting holes.
The Molding will get a cap that isn't shown in the picture, it was wrapped up and I didn't want to unwrap it before delivery.